After months of alleged plotting, the FBI says the five men arrested in a foiled bombing plan settled on the Brecksville-Northfield High Level Bridge as a target.
Here's a snapshot of details about the bridge:
- Concrete arch bridge
- 1130' feet long
- Carries four lanes of traffic
- Spans Cuyahoga River on Route 82
- Connects Brecksville and Northfield
- Designed and constructed by Alfred M. Pelgate
- Opened in 1931
Photos: 5 arrested in Brecksville bridge plot